Skip to main content

Send Us a Message

Search

Aqua Master Tools P160 Pro Electrode

starting from 0% interest financing from /mo.

Payment Options

Options:Pay in Four, Pay Monthly
Amount:Up to $1,500 (Pay in 4)
Up to $10,000 (Monthly)
Schedule:Bi-weekly to Monthly
Term:6 weeks, 12 or 24 months
Interest:0% to 35.99% APR*
Credit Check?Soft Check Only
Schedule:Bi-weekly to Monthly
Term:6 weeks, 6 or 12 months
Interest:0% to 35.99% APR*
Credit Check?Soft Check Only
Finance up to:$4,000
Must apply on a desktop device.
Schedule:Flexible
Term:Up to 36 months
Interest:Processing fee + interest
Lease-to-Own?Yes
Amount:$500 to $10,000
  • Restores measurement of pH, EC, PPM, TDS, and temperature on existing P160 Pro units.
  • Provides IP67 waterproof protection when properly tightened to the meter housing.
  • Engineered exclusively for the Aqua Master Tools P160 Pro combo pen.
  • View More Details

Earn 59 points for shopping and get $0.59 off your next order. Join Harvest Club for free.

Questions? Talk to a specialist. Mon–Fri, 9am–5pm PST
Free Shipping On Most Items* To the lower 48
Transparent Pricing Backed w/ price match guarantee
Secure Checkout SSL encrypted payments

Send Us a Message

Ask Sage about this product
VOLUME PRICING

Commercial & Bulk Purchasing

We support operations & licensed facilities with volume pricing, dedicated account managers, and custom equipment consultation.

Commercial Inquiry

Contact Information
THROUGH THE Cultivator's LENS Hands-On Evaluation

  • You are replacing a faulty electrode because your current probe is providing drifting readings and you need consistent data for your nutrient batches.
  • You are keeping a spare probe on hand because you cannot afford to have your pen out of commission while waiting for a shipment.

  • The sealing ring is easy to cross-thread, so take your time and make sure it sits flat before you start turning.
  • Always keep a little distilled water in the cap when you store it to keep the sensor from drying out.

  • Users who swapped out their old, tired sensors say their pens felt brand new again immediately after recalibration.
  • Growers who kept this on the shelf as a backup say it saved their feeding schedule when their primary probe finally gave out.

Aqua Master Tools P160 Pro Electrode

A worn or damaged electrode doesn't mean replacing your entire P160 Pro combo pen. This replaceable pH, EC, PPM, TDS, and temperature electrode is built specifically for the P160 Pro, restoring accurate readings across all measurements without the cost of a full replacement unit. Once attached, it's IP67 waterproof, matching the protection of the meter itself.

Features

🔌
Drop-In Replacement

Purpose-built for the P160 Pro, so you can restore accuracy without replacing the whole pen.

💧
IP67 Waterproof

Fully waterproof once properly attached, matching the protection of the meter itself.

Installation Instructions

  1. Properly unscrew the sealing ring in the lower part of the meter.
  2. Remove the defective or old electrode by gently pulling it.
  3. Carefully place the new electrode with the recess in the correct position so the connectors properly connect without damaging the meter or electrode.
  4. Check that the rubber seal is properly placed.
  5. Tightly tighten the sealing ring.
  6. Calibrate the meter as described in the user manual.
  7. The meter is now ready for use.

Specifications

Specification Value
Compatibility Aqua Master Tools P160 Pro Combo Pen
Measures pH, EC, PPM, TDS, and Temperature
Waterproof Rating IP67 (when attached to meter)
Dimensions 1.18 × 1.18 × 3.58 in

Video Tutorial

Frequently Asked Questions

Which meter is this electrode for? +

This replacement electrode is designed specifically for the Aqua Master Tools P160 Pro combo pen.

What does this electrode measure? +

This electrode measures pH, EC, PPM, TDS, and temperature, matching the full set of parameters the P160 Pro is designed to read.

Is the electrode waterproof? +

Yes, once properly attached to the meter, the electrode is IP67 waterproof, matching the protection level of the P160 Pro itself.

How do I replace the electrode? +

Unscrew the sealing ring, gently remove the old electrode, align the new one with its recess, check the rubber seal, and retighten the sealing ring. Full steps are listed above, or in the linked how-to video.

Do I need to calibrate the meter after replacing the electrode? +

Yes, calibrate the meter as described in the user manual after installation so it's ready for accurate readings.

What should I check before tightening the sealing ring? +

Confirm the rubber seal is properly placed before tightening the sealing ring, as this maintains the electrode's waterproof rating.

Happy To Help

Questions About This Product?

Our specialists are happy to help. Call us or send a message and we'll get back to you within one business day (most of the time within a few hours.)

Call (360) 800-5535

Why Trimleaf

Equipping home growers, craft producers, and commercial operations across North America since 2016.

10+
Years of Specialist Knowledge
4.8★
1950+ Verified Reviews
50,000+
Growers Served
120+
Top Equipment Brands in Stock